We have a dedicated and in house taught installation team all our operatives have CSCS cards and the majority have IPAF certificates.
![]() |
On a project in Manchester there was a Health and Safety issue with building the steel frame in situ, we therefore solved the problem by building the frame sections on the ground, we then, utilizing temporary frames lifted the metal glazing grids into place. | ![]() |
| On a project with ‘Access’ issues we designed and built an installation gantry that run on the actual glazing grid. The gantry had man access as well as a remote control mobile crane for Glass and Brise Solie installation. | ![]() |
|